  • What is a mixed-integer linear programming model for offshore oil-field development?
  • In this work, a mixed-integer linear programming (MILP) model is proposed for the optimal design and scheduling of offshore oil-field development. The model solves for decisions related to allocation and scheduling to maximize net present value (NPV). Decision variables include drilling schedule, well assignment to FPSO, and FPSO capacities.
  • What is design review in oil & gas project?
  • Design review is a key step in the detailed design stage of every oil and gas project. It is considered a key milestone for the design process. The design review is planned and implemented after sufficient development of the design. The Design Review does not check the full technical detail of specific designs or processes.
  • What drives project production?
  • Project production, like many other types of production outside the oil and gas industry, is driven by the science of operations.
  • What is a good line design?
  • A good line design would follow the overall material flow and go from the left to the right. A bad line design would go in the opposite direction, requiring you to transport all material through the plant twice. And, as you surely know, transportation is one of the seven types of waste (muda) that should be reduced or eliminated.
  • Do oilfields need a waterflood design?
  • However, the development of oilfields often requires detailed design for secondary recovery, such as waterflood (Craig, 1971, Willhite, 1986). Optimal waterflood design depends on both state variables (e.g., reservoir pressure and saturation) and input control variables (e.g., injection rate and production pressure).
  • What environmental considerations should you consider when planning a new oil plant?
  • Another important environmental consideration is the carbon footprint of the proposed facility. According to the utilities table (see Table 5.3), this site uses 1.3 million kg of oil per year to run the pumps, ECs, onsite facilities for employees, among other things.